Subscribe here for Latest Jobs Alerts for FREE to your E-mail:

>
Don't Forget To "Activate" Subscription by link sent to your email

MAHATRANSCO Syllabus and Exam Pattern 2015

Paper Pattern of Test for the Post of E.E. (Trans), Dy E.E. (Trans/Civil) & Je (Trans)-Trainee 2015


Section
Number of Questions
Marks
Time
Test of Professional Knowledge
50
110
Composite time of 2
hours for all the
sections together
General Aptitude, Logical / Analytical
Reasoning, Problem Solving, etc.
80
40

Total
130
150


Professional Knowledge Test Syllabus for the Post of Executive Engineer (Trans) & Dy. Executive Engineer (Trans)


EHV Transmission Lines:
  • Survey, profiles, clearances, tower spotting, sag-tension, normal towers extensions, special towers, PTCC, Railway, Aviation, Forest & other statutory approval.
  • Forces on towers, design criteria, F.O.S
  • Choice of Conductor size & configuration, resistance, reactance, capacitance of lines & their impact on design & performance of lines
  • Conductor / Earthwire hardware & accessories, Insulators, string efficiency, Tower Accessories
  • Earthing –types, criteria, Ground wire
  • Foundations of towers, stub-setting, Erection of towers, stringing
  • Operation & Maintenance of lines (live line & dead line) monitoring performance parameters, trouble shooting, patrolling
  • Testing, commissioning of lines
  • Plans/targets of MAHATRANSCO, Power status of the state & the country
  • Protective relaying systems.
EHV Sub-Stations:
  • Choice of Voltage, requirement of land, acquisition process.
  •  Fault level, choice of rating of equipments & Busbars
  •  Earthing System – design & construction, illumination
  • Control & relaying systems, control & power cabling.
  • Various Bus-bar types & their choice, layout
  • Ratings of Circuit breaker, CTs, PTs, CVTs, Las, etc
  • Erection, commissioning, testing of power transformers, drying out transformer oil, fire fighting.
  • Condition monitoring of equipment
  • Management of EHV Projects.
  • O&M of EHV Sub-Stations
  • PLCC, Battery, Battery charging, auxiliary supply
  • ABT metering, load dispatch, open access & other matters relating to transmission provided for Electricity Act-2003.
STU:
  • Power System analysis studies.
  • Commercial mechanism of grid operation.
  • Regulatory requirements and commitment 

Professional Knowledge Test Syllabus for the Post of Dy. Executive Engineer (Civil)

EHV Transmission Lines:
  • Survey, profiles, clearances, tower spotting, PTCC, Railway, Aviation, Forest & other statutory approvals.
  • Forces on towers
  • Foundations of towers, stub setting
EHV Sub-stations:
  • Land Acquisition- Procedures, Rules, Regulations & Acts, Land requirement.
  • Soil Mechanics: Soil properties, soil investigation required for substation.
  • Concrete Technology – Concrete mix design. Material Cement / Stand / Metal / Reinforcement.
  • Reinforcement detailing – Reading of drawings, Bar bending Schedule etc.
  • Construction Technology – Material consumption for different items, estimate preparation, Rate analysis, Specifications & mode of measurements. Rehabilitation of old structures, Repairs/water proofing etc.
  • Bonds of brick masonry, stone masonry etc.
  • Theory of Structures – Elementary knowledge Shear force/ Bending movement, Forces on structures like portal retaining wall, water tanks.
  • Preliminary knowledge of water supply and Sanitary Engineering.

Professional Knowledge Test Syllabus for the Post of Jr. Engineer (Trans) - Trainee

  • Professional Knowledge Test will contain questions on Electrical Engineering/Power Engineering field which candidate have studied at the Degree level.

No comments:

Post a Comment

Subscribe here for Latest Jobs Alerts for FREE to your E-mail:

>
Don't Forget To "Activate" Subscription by link sent to your email